Quincy Adams Elevator 807 (lobby to parking garage) is closed for replacement.
The two outer lanes at the Quincy Adams Garage toll plaza over Centre St are closed until further notice. Repairing the bridge is part of the South Shore Garage Project. More: https://www.mbta.com/south-shore-garages
The Quincy Adams parking garage has re-opened with 500 spaces available. Additional spaces will be added as construction finishes up. Customers can access the garage via the Route 3 off ramp exit. The Burgin Parkway entrance remains closed.
The Braintree Parking Garage has re-opened with 350 parking spots available. Additional spaces will be added as construction finishes up. The surface lot on Ivory St will remain open as an alternate parking option.

Bus Connections

238

Train Connections

Park St (Green Line)
Downtown Crossing (Orange Line)