< Back
Alerts
Haverhill Line Train 266 (5:30 pm from Haverhill) is expected to depart Haverhill 5-15 minutes behind schedule due to earlier police activity on the right of way and an equipment shortage.
Affected direction: InboundPosted 10/9/2025 5:11:00 PM
Worcester Line Train 553 (4:00 pm from South Station) is operating 5-15 minutes behind schedule between Westborough and Worcester.
Affected direction: OutboundPosted 10/9/2025 5:09:04 PM
Haverhill Line Train 255 (3:45 pm from North Station) is operating 25-35 minutes behind schedule between Andover and Haverhill due to earlier police activity on the right of way and an equipment shortage.
Affected direction: OutboundPosted 10/9/2025 5:08:01 PM
Fitchburg Line Train 434 (4:35 pm from Wachusett) is operating 5-15 minutes behind schedule between Shirley and North Station.
Affected direction: InboundPosted 10/9/2025 5:07:40 PM
Haverhill Line Train 259 (4:25 pm from North Station) is operating 10-20 minutes behind schedule between Wakefield and Haverhill.
Affected direction: OutboundPosted 10/9/2025 5:06:30 PM
Providence Line Train 861 (4:52 pm from South Station) is operating 5-15 minutes behind schedule between Back Bay and Wickford Junction.
Affected direction: OutboundPosted 10/9/2025 5:05:04 PM
Worcester Line Train 560 (4:30 pm from Worcester) is operating 20-30 minutes behind schedule between Worcester and South Station due to an earlier unruly passenger.
Affected direction: InboundPosted 10/9/2025 5:02:32 PM
Franklin Line Train 759 (4:27 pm from South Station) is operating 5-15 minutes behind schedule between Hyde Park and Forge Park/495 due to Amtrak infrastructure repairs.
Affected direction: OutboundPosted 10/9/2025 5:00:49 PM
Route 714 is experiencing delays of up to 30 minutes due to accident
Posted 10/9/2025 4:51:35 PM
Route 43 is experiencing delays of up to 25 minutes due to traffic
Posted 10/9/2025 4:45:27 PM
Providence Line Train 857 (4:20 pm from South Station) is operating 5-15 minutes behind schedule between Route 128 and Providence.
Affected direction: OutboundPosted 10/9/2025 4:44:42 PM
Route 10 is experiencing delays of up to 25 minutes due to traffic
Posted 10/9/2025 4:44:35 PM
Haverhill Line Train 256 (4:02 pm from Haverhill) is operating 20-30 minutes behind schedule between Lawrence and North Station due to earlier police activity on the right of way.
Affected direction: InboundPosted 10/9/2025 4:36:24 PM
Route 505 is experiencing delays of up to 20 minutes due to traffic
Posted 10/9/2025 4:30:55 PM
Route 501 is experiencing delays of up to 20 minutes due to traffic
Posted 10/9/2025 4:30:29 PM
Route 60 is experiencing delays of up to 20 minutes due to traffic
Posted 10/9/2025 4:30:13 PM
Please board Haverhill Line Train 266 (5:30 pm from Haverhill) on Track 1 (outbound side) at Haverhill and Bradford today.
Affected direction: Inbound Affected stops: Haverhill BradfordPosted 10/9/2025 4:30:01 PM
Foxboro Line Train 1757 (4:05 pm from South Station) is operating 5-15 minutes behind schedule between Ruggles and Foxboro due to Amtrak infrastructure repairs.
Affected direction: OutboundPosted 10/9/2025 4:29:20 PM
Green Line D Branch: Shuttle buses will replace service between Riverside and Kenmore beginning at 8 PM on Friday, October 24, through October 31, for track and infrastructure work. Accessible local and express shuttles will be available.
Express Shuttles: Shuttle buses will make all stops between Riverside and Newton Highlands and then run express to Copley. Local Shuttles: Shuttle buses will make all stops between Riverside and Kenmore except Beaconsfield. Travel Time: Riders using shuttles should allow for ample extra travel time. For example, a rider traveling to Government Center from Riverside should budget at least an additional 30 – 45 minutes. Free Bluebikes Access: During this closure, the City of Boston is offering a promotion code for up to five free Bluebikes unlocks, MBTAGREEN1024. Shuttle Stop Locations: Riverside: Riverside Station Woodland: Eastbound & Westbound - Woodland Station Waban: Eastbound - Beacon St @ Waban Station Westbound - Beacon St opp Waban Station (1651 Beacon St) Eliot: Eastbound - Lincoln St @ Woodward St (170 Lincoln St) Westbound - Lincoln St @ Woodward St (173 Lincoln St) Newton Highlands: Eastbound - Walnut St @ Lincoln St (Officer English Park) Westbound - Walnut St @ Floral St (1170 Walnut St) Newton Centre: Eastbound - Langley Rd @ Braeland Ave Westbound - Langley Rd opp Braeland Ave (80 Langley Rd) Chestnut Hill: Eastbound - Boylston St @ Hammond St (1182 Boylston St) Westbound - Boylston St @ Hammond St Reservoir: Eastbound & Westbound - Reservoir Station Beaconsfield: Due to narrow roads near Beaconsfield, shuttles cannot safely stop there. We recommend taking the Green Line C Branch from Dean Road, about a 4 minute walk. Brookline Hills: Eastbound - Boylston St @ Cypress St (308 Boylston St) Westbound - Boylston St @ Cypress St (365 Boylston St) Brookline Village: Eastbound - Brookline Ave @ Pearl St Westbound - Pearl St @ Brookline Village (10 Brookline Pl) Longwood: Eastbound - Brookline Ave @ Longwood Ave (330 Brookline Ave) Westbound - Brookline Ave @ Longwood Ave (429 Brookline Ave) Fenway: Eastbound & Westbound - Park Dr @ Fenway Station Kenmore: Eastbound & Westbound - 512 Commonwealth Ave Copley: Eastbound - Boylston St @ Dartmouth St Westbound - Boylston St @ Clarendon StPosted 10/9/2025 4:27:46 PM
Fitchburg Line Train 425 (3:40 pm from North Station) is operating 5-15 minutes behind schedule between Brandeis/Roberts and Wachusett.
Affected direction: OutboundPosted 10/9/2025 4:20:56 PM
Route 430 is experiencing delays of up to 20 minutes due to traffic
Posted 10/9/2025 4:13:21 PM
Route 716 is experiencing delays of up to 15 minutes due to traffic
Posted 10/9/2025 4:11:16 PM
Route 65 is experiencing delays of up to 20 minutes due to traffic
Posted 10/9/2025 4:10:08 PM
Route 7 is experiencing delays of up to 25 minutes due to traffic
Posted 10/9/2025 4:06:48 PM
Franklin Line Train 751 (3:20 pm from South Station) is operating 5-15 minutes behind schedule between Norwood Central and Forge Park/495 due to Amtrak infrastructure repairs.
Affected direction: OutboundPosted 10/9/2025 4:06:46 PM
Route 32 is experiencing delays of up to 20 minutes due to traffic
Posted 10/9/2025 4:04:57 PM
Rockport Line Train 51 (3:05 pm from North Station) is operating 5-15 minutes behind schedule between Beverly Farms and Rockport.
Affected direction: OutboundPosted 10/9/2025 4:02:54 PM
Worcester Line Train 549 (2:40 pm from South Station) is operating 35-45 minutes behind schedule between Wellesley Square and Worcester due to an earlier unruly passenger.
Affected direction: OutboundPosted 10/9/2025 3:58:48 PM
Providence Line Train 851 (3:20 pm from South Station) is operating 5-15 minutes behind schedule between Ruggles and Providence.
Affected direction: OutboundPosted 10/9/2025 3:49:39 PM
Route 137 is experiencing delays of up to 20 minutes due to traffic
Posted 10/9/2025 3:48:51 PM
Route 77 is experiencing delays of up to 20 minutes due to traffic
Posted 10/9/2025 3:43:45 PM
Route 73 is experiencing delays of up to 20 minutes due to traffic
Posted 10/9/2025 3:43:28 PM
Fitchburg Line Train 428 (3:25 pm from Wachusett) is operating 5-15 minutes behind schedule between Wachusett and North Station.
Affected direction: InboundPosted 10/9/2025 3:39:20 PM
Route 455 is experiencing delays of up to 20 minutes due to traffic
Posted 10/9/2025 3:18:52 PM
Route 435 is experiencing delays of up to 20 minutes due to traffic
Posted 10/9/2025 3:17:57 PM
Silver Line - SL1 is experiencing delays of up to 20 minutes due to traffic
Posted 10/9/2025 3:10:20 PM
Route 28 is experiencing delays of up to 20 minutes due to traffic
Posted 10/9/2025 3:10:09 PM
Route 45 is experiencing delays of up to 20 minutes due to traffic
Posted 10/9/2025 3:01:41 PM
Route 44 is experiencing delays of up to 20 minutes due to traffic
Posted 10/9/2025 3:01:26 PM
Route 19 is experiencing delays of up to 20 minutes due to traffic
Posted 10/9/2025 3:01:10 PM
Route 17 is experiencing delays of up to 20 minutes due to traffic
Posted 10/9/2025 3:00:43 PM
Route 9 is experiencing delays of up to 20 minutes due to traffic
Posted 10/9/2025 2:59:29 PM
Franklin Line Train 744 (1:16 pm from Forge Park/495) is operating 30-40 minutes behind schedule between Readville and South Station due to Amtrak infrastructure repairs and an unruly passenger.
Affected direction: Inbound Affected stops: Dedham Corporate Center South StationPosted 10/9/2025 2:55:11 PM
Silver Line - SL4 is experiencing delays of up to 20 minutes due to traffic
Posted 10/9/2025 2:50:24 PM
Route 31 is experiencing delays of up to 25 minutes
Posted 10/9/2025 2:49:37 PM
Route 39 is experiencing delays of up to 20 minutes due to traffic
Posted 10/9/2025 2:49:03 PM
Route 26 is experiencing delays of up to 20 minutes
Posted 10/9/2025 2:47:28 PM
Please board all inbound Worcester Line trains on the outbound platform (Track 1) at West Natick through Wellesley Farms until 8:00 pm.
Affected direction: Inbound Affected stops: West Natick Natick Center Wellesley Square Wellesley Hills Wellesley FarmsPosted 10/9/2025 2:10:16 PM
Please board all outbound Framingham/Worcester Line trains on the inbound platform (Track 2) at Wellesley Farms through Framingham until 8:00 pm.
Affected stops: Wellesley Farms Wellesley Hills Wellesley Square Natick Center West Natick FraminghamPosted 10/9/2025 2:09:36 PM
Please board all inbound Framingham Line trains on the outbound platform (Track 1) at Framingham through Wellesley Farms until 8:00 pm.
Affected direction: Inbound Affected stops: Framingham West Natick Natick Center Wellesley Square Wellesley Hills Wellesley FarmsPosted 10/9/2025 2:09:06 PM
Route 222 is experiencing delays of up to 20 minutes due to traffic
Posted 10/9/2025 1:28:21 PM
Route 40 is experiencing delays of up to 20 minutes due to traffic
Posted 10/9/2025 1:24:23 PM
Route 36 is experiencing delays of up to 25 minutes due to traffic
Posted 10/9/2025 1:24:00 PM
North Station Escalator 391 (Causeway Street lobby to Forest Hills, Copley & West platform) unavailable due to maintenance
Posted 10/9/2025 1:03:01 PM
Aquarium Elevator 925 (Atlantic Avenue lobby to Long Wharf) will be unavailable the weekend of October 11 - 12 due to maintenance.
To exit, use Aquarium Elevator 913 (Wonderland platform) or Aquarium Elevator 914 (Bowdoin platform) located at the opposite end of the platform to access the State St lobby, then use Aquarium Elevator 915 to access the street. To board, cross the Rose Kennedy Greenway, then continue west along State St to the Aquarium State St entrance and use Aquarium Elevator 915.Posted 10/9/2025 11:38:14 AM
Natick Center Elevator 751 (Track 2 to street) unavailable
To exit: Go to the east end of the platform. Take the ramp to Washington St. To board: Go south on Main St. Turn left on South Ave and go one block. Turn left on Washington St. Take the ramp to the Track 2 platform.Posted 10/9/2025 11:26:01 AM
Andrew Escalator 124 (Ashmont/Braintree platform to busway) unavailable due to maintenance
Posted 10/9/2025 11:24:01 AM
Route 504 is experiencing delays of up to 25 minutes due to traffic
Posted 10/9/2025 11:10:52 AM
Route 37 detoured due to construction (inbound only). Connections can be made at Baker St @ Lasell St and Lasell St @ Perham St.
Affected direction: Inbound Affected stops: Lasell St @ Temple StPosted 10/9/2025 10:17:09 AM
Park Street Elevator 808 (Red Line center platform to Government Center & North platform, Winter Street Concourse) unavailable due to maintenance
To exit, use Park Street Elevator 979 located on the Red Line center platform to access the Green Line westbound platform. At the Green Line platform, exit through the faregates and use Park Street Elevator 978 to access the Boston Common. To board the Red Line, use Park Street Elevator 978 located on the Boston Common to access the Green Line westbound lobby. At the lobby, enter throught the faregates, turn left, and use Park Street Elevator 979 to access the Red Line center platform.Posted 10/9/2025 10:09:18 AM
CT2 is experiencing delays of up to 20 minutes due to parade
Posted 10/9/2025 10:00:01 AM
Route 34E detoured due to construction. The nearest inbound connections are 710 East St opp Kendall St or Washington St opp Washington Green. The nearest outbound connections are Washington St @ Washington Green or East St @ Kendall St.
Affected stops: Washington St @ Short St (outbound) Washington St @ Lafayette Dr (outbound) 625 Washington St (outbound) 624 Washington St opp Bird Middle School (inbound) Washington St @ Pilgrim Way (inbound) Washington St @ Polley Ln (inbound)Posted 10/9/2025 9:41:40 AM
Route 236 detoured. Inbound connections at Franklin St @ Viden Rd and Franklin St @ Richie Rd. Outbound connections at Franklin St @ High St and Franklin St opp Penns Hill Rd
Affected stops: Franklin St @ Norman Rd (outbound) Franklin St @ HooverAve (outbound) Franklin St opp Norman Rd (inbound) Franklin St opp High St (inbound)Posted 10/9/2025 8:35:57 AM
Route 131 detoured due to construction (inbound only). Connections can be made at Main St @ Melrose St and Porter St @ Bellevue Ave.
Affected direction: Inbound Affected stops: Porter St @ Rowe StPosted 10/9/2025 7:56:55 AM
North Station Escalator 447 (Passageway to Commuter Rail, TD Garden) unavailable
Posted 10/9/2025 7:38:50 AM
Worcester Elevator 782 (parking lot to pedestrian bridge) will be unavailable from Thursday, Oct 9th at 7:30AM until Friday, Oct 10th at 7:30AM for testing. Passengers may use the elevators located at 2 Washington Sq. for ADA access to the platform.
Posted 10/9/2025 7:00:47 AM
Winchester Center Elevator 748 (Track 1 (outbound platform) to Waterfield St, parking) unavailable for platform repair work. The ramp and the North elevator off Main St. will still be open.
Please use nearby Winchester Center Elevator 749.Posted 10/9/2025 3:00:02 AM
Jersey St @ Boylston St (inbound) bus stop is temporarily moving through Wed Oct 15 due to construction. Riders can board at Queensberry St @ Jersey St.
Affected routes: 55Posted 10/9/2025 3:00:02 AM
Davis Escalator 338 (Unpaid lobby to College Avenue landing) unavailable from Tue Oct 14 through Thu Oct 16 due to maintenance
Posted 10/9/2025 3:00:01 AM
Quincy Ferry Notice: The Seaport/Fan Pier stop will be bypassed through the end of service on Friday, October 10.
Posted 10/9/2025 12:00:04 AM
The West Medford mini-high outbound platform will be closed for waterproofing work from Thursday, October 9th at 8:00 PM until Friday, October 10th at 8:00 AM. Portable accessible lifts will be available.
Posted 10/9/2025 12:00:04 AM
Franklin/Dean mini-high platform will now be closed for waterproofing work from Tuesday October 7th at 8:00 PM until Wednesday October 8th and 8:00 AM. Portable accessible lifts will be available.
Posted 10/9/2025 12:00:04 AM
Route 450 outbound will be detoured every Friday, Saturday, and Sunday in October, from start to end of service, for Salem Haunted Happenings. Connections can be made at Essex St @ Summer St & Salem Depot
Missed stops: Washington St @ New Derby St Washington St @ Church StPosted 10/9/2025 12:00:03 AM
Route 714 inbound will not service Nantasket Ave from Wharf Ave to Park Ave due to construction. Riders may flag down the bus at a safe location along George Washington Blvd for inbound service only.
Posted 10/8/2025 3:08:01 PM
Salem Elevator 996 (Bridge St to parking garage to busway and platforms) is unavailable for maintenance until further notice. The adjacent elevator, 997, is fully operational.
Please use nearby Salem Elevator 997.Posted 10/8/2025 10:09:56 AM
North Station Elevator 912 (Orange Line, Green Line lobby to Causeway Street) unavailable from Tue Oct 14 through Wed Oct 15 due to maintenance
To exit, proceed up the passageway (to TD Garden) and use North Station Elevator 731 to access Causeway St. Alternatively, pass through the fare gates and walk the full length of the Green Line platform to reach the opposite lobby at Valenti Way. At this lobby, use North Station Elevator 909 (lobby to Valenti Way) to reach the street level. To board, cross Causeway St and use North Station Elevator 731 to access the passageway and lobby. Alternatively, enter the main TD Garden entrance, turn right and use North Station Elevator 732 to access the passageway.Posted 10/8/2025 3:00:01 AM
George's Island will remain closed this season due to waterline repairs.
Affected routes: Hingham/Hull FerryPosted 10/7/2025 3:00:01 AM
Orange Line: Service will be suspended between Forest Hills and North Station from October 11 - 13, for signal upgrades. Use shuttle buses between Forest Hills and Back Bay. Use Green Line between Copley/Back Bay and North Station.
Fare-Free Commuter Rail Alternative: Riders can use the Franklin/Foxboro, Needham, or Providence/Stoughton Lines fare-free for service between Forest Hills, Ruggles, Back Bay and South Station. Regular fares will apply to travel beyond Forest Hills. Accessible Service: Accessible vans will be available, as needed, between North Station and Back Bay. Please see station personnel for assistance. Travel Time: Riders using shuttles should allow for ample extra travel time. For example, a rider travelling to Downtown Crossing from Forest Hills should budget at least an additional 30 minutes of travel time. Affected Orange Line Stations and Alternative Service: North Station (Transfer within Station to Green Line) Haymarket (Transfer within Station to Green Line) State (Use Government Center, 0.2 mi.) Downtown Crossing (Use the Winter St Concourse to Park Street, 0.2 mi.) Chinatown (Use Boylston, 0.1 mi.) Tufts Medical Center (Use Boylston, 0.3 mi.) Back Bay (Use Copley, 0.2 mi.) Shuttle Bus Stops: Back Bay: Northbound - Back Bay Station (165 Dartmouth St) Southbound - Clarendon St @ Back Bay Busway (Clarendon St Garage) Copley: Northbound - Use Green Line at Copley Southbound - Copley Square (Boylston St @ Clarendon St) Massachusetts Avenue: Northbound - Columbus Ave @ Mass Ave (584 Columbus Ave) Southbound - Columbus Ave @ Mass Ave (585 Columbus Ave) Ruggles: Northbound - Ruggles Station (Upper Busway) Southbound - 1125 Tremont St Roxbury Crossing: Northbound - Columbus Ave @ Malcolm X Blvd (1184 Columbus Ave) Southbound - Tremont St @ Roxbury Crossing Station (1135 Columbus Ave) Jackson Square: Northbound - Jackson Square Station (250 Centre St) Southbound - Columbus Ave @ Amory St (1579 Columbus Ave) Stony Brook: Northbound - Stony Brook Station Southbound - Amory St @ Boylston St (207 Amory St) Green Street: Northbound - Amory St @ Gordon St (Southwest Corridor Park at Green Street Station) Southbound - Amory St @ Green St (433-451 Amory St) Forest Hills: Forest Hills Station (Lower Busway)Posted 10/6/2025 12:09:14 PM
Arlington Elevator 962 (Copley & West platform to lobby) unavailable due to maintenance
To exit, exit the train at Copley, then cross Boylston St to the eastbound entrance. Proceed to the eastbound platform, then take an eastbound train to Arlington and use Arlington Elevator 963. See station personnel at the Copley eastbound lobby to gain entry at the faregate. To board, use Arlington Elevator 963 to access the eastbound platform. Take an eastbound train to Park Street, then proceed to the westbound platform and transfer to a westbound train.Posted 10/6/2025 7:55:02 AM
There are no bikes allowed on Newburyport/Rockport Line trains during weekends in October.
Posted 10/6/2025 3:14:02 AM
Route 40 is being detoured until further notice. Buses are omitting Georgetowne Dr @ Margaretta Dr. Please use the nearby stop at W Boundary Rd @ Georgetowne Dr.
Affected stops: Georgetowne Dr @ Margaretta Dr (outbound) Margaretta Dr @ Crown Point Dr (outbound) Margaretta Dr @ Crown Point Dr (inbound) Georgetowne Dr opp Margaretta Dr (inbound)Posted 10/6/2025 3:00:00 AM
The Chestnut Hill Parking Lot will be partially closed from Oct 6 - 17, and completely closed from Oct 24 - 31. Alternative parking is available at the Woodland Garage or Riverside station.
Posted 10/6/2025 2:30:03 AM
A new Franklin/Foxboro Line schedule is in effect as of on Monday, September 8. More morning peak service inbound trains serve Forest Hills, Ruggles, and Back Bay.
The Franklin/Foxboro Line remains on a temporary construction schedule as Amtrak’s emergency infrastructure repairs will continue beyond October 27th. Construction and service updates for the Franklin/Foxboro, Providence/Stoughton, and Fairmount Lines will be provided as work progresses.Posted 10/5/2025 10:31:52 PM
Jackson Square: The platform is undergoing renovations to improve safety and accessibility. Sections of the platform are unlevel, which may make it difficult for some riders to board and exit trains. This work will take place through fall 2025.
Please see station personnel or use a station call box to request assistance.Posted 10/4/2025 3:00:01 AM
A new Fairmount Line schedule will be in effect starting on Monday, September 8. These changes reflect the Amtrak infrastructure repair progress.
The Fairmount temporary construction schedule will remain in effect as the rail replacement project to prepare the line for battery-electric trains continues. Construction and service updates for the Franklin/Foxboro, Providence/Stoughton, and Fairmount Lines will be provided as work progresses.Posted 10/3/2025 1:23:02 PM
The Providence/Stoughton Line construction schedule has been adjusted & allows for Amtrak’s emergency infrastructure repairs to continue. Those changes will go into effect on October 27. The updated schedule is available on mbta.com.
-Construction and service updates for the Franklin/Foxboro, Providence/Stoughton, and Fairmount Lines will be provided as work progresses. -Holiday service: On Thursday, November 27th, 2025 (Thanksgiving Day), Thursday, December 25th, 2025 (Christmas Day), Thursday, January 1st, 2026 (New Year’s Day), and Monday, February 16th, 2026 (President’s Day) all lines will operate on a weekend schedule. On Tuesday, November 11th, 2025 (Veterans' Day), Friday, November 28th, 2025 (Day after Thanksgiving), Monday, January 19th, 2026 (Martin Luther King Jr. Day), and Monday, April 20th, 2026 (Patriot’s Day), all lines will operate on a regular weekday schedule.Posted 10/3/2025 11:44:24 AM
The new Fall/Winter Schedule will go into effect on Monday, October 27th with seasonal and on-time performance adjustments. The schedule for all lines are available on MBTA.com now and at Boston hub stations soon.
Holiday service: On Thursday, November 27th, 2025 (Thanksgiving Day), Thursday, December 25th, 2025 (Christmas Day), Thursday, January 1st, 2026 (New Year’s Day), and Monday, February 16th, 2026 (President’s Day) all lines will operate on a weekend schedule. On Tuesday, November 11th, 2025 (Veterans' Day), Friday, November 28th, 2025 (Day after Thanksgiving), Monday, January 19th, 2026 (Martin Luther King Jr. Day), and Monday, April 20th, 2026 (Patriot’s Day), all lines will operate on a regular weekday schedule.Posted 10/3/2025 11:40:19 AM
The Water St @ Watertown Yard stop has been permanently closed. Riders can board a bus at the new stop located at the corner of Technology Way.
Affected routes: 52 57 504Posted 10/1/2025 9:25:01 AM
Vehicle traffic in or out of Salem Station parking garage is prohibited between 6:00 PM and 11:30 PM on Halloween day, October 31, 2025.
Posted 9/30/2025 3:55:45 PM
Wellington Escalator 310 (Oak Grove platform to paid lobby) unavailable from Tue Oct 28 through Thu Oct 30 due to maintenance
Posted 9/30/2025 11:05:21 AM
Davis Escalator 339 (College Avenue landing to unpaid lobby) unavailable from Tue Oct 21 through Thu Oct 23 due to maintenance
Posted 9/30/2025 11:04:36 AM
Government Center Escalator 446 (Blue Line platform to Green Line platform) unavailable due to maintenance
Posted 9/30/2025 8:15:02 AM
Chinatown Elevator 876 (Oak Grove platform to Washington St, Essex St) will be unavailable through Mon Nov 3 for major equipment upgrades.
The elevator will be closed for work that will significantly improve its long-term reliability. To Exit: Take an Oak Grove Train to Downtown Crossing; then take Downtown Crossing elevator 891 to Franklin Street. At Franklin Street customers should turn left and travel 450 feet south on Washington Street then take Downtown Crossing elevator 892 to the Forest Hills platform. Then take a Forest Hills Train to Chinatown and use elevator 922 to exit the station. To Board: Go to Chinatown Elevator 922 on Essex St. Take Elevator 922 to the Forest Hills platform. Take a Forest Hills train to Tufts Medical Center. Transfer to an Oak Grove train.Posted 9/29/2025 2:37:19 PM
To accommodate Providence Station Renovations, construction barriers have been installed and the Southern stairwell to Track 1 is out of service. Staircase access to Track 3 and Track 5 are now open.
Affected lines: Providence/Stoughton Line Foxboro (Special Events)Posted 9/24/2025 12:49:31 PM
North Station Elevator 731 (Passageway to Causeway Street) unavailable from Tue Oct 28 through Thu Oct 30 due to maintenance
To exit, use North Station Elevator 912 located in the lobby to access the corner of Haverhill St and Causeway St. To board, cross Causeway St, and at the corner of Haverhill St and Causeway St, use North Station Elevator 912 to access the lobby.Posted 9/24/2025 11:28:19 AM
Downtown Crossing Elevator 870 (Ashmont/Braintree platform to Summer Street Concourse) unavailable from Tue Oct 21 through Wed Oct 22 due to maintenance
To exit, exit the train at Park Street onto the Red Line center platform and use Park Street Elevator 979 to access the Green Line westbound platform. At the Green Line platform, exit through the faregates and use Park Street Elevator 978 to access the Boston Common. To board the Red Line, take an Alewife-bound train to Park Street, exit onto the center platform, and transfer to an Ashmont/Braintree-bound train.Posted 9/24/2025 11:27:20 AM
The inbound entrance for Attleboro Station is closed. Inbound access is unavailable via the stairs and accessibility ramp on Route 152/South Main Street. Access is detoured to stairs on Mill Street or the Inbound parking area on Union Street.
Affected lines: Providence/Stoughton Line Foxboro (Special Events)Posted 9/23/2025 7:39:01 AM
The Somerville Ave @ Central St (outbound) bus stop is temporarily closed until the end of October due to construction. Riders can use the temporary stop located on the opposite side of Bleachery Court.
Affected routes: 83 87Posted 9/18/2025 9:06:36 AM
Route 435 detoured due to construction. The nearest outbound connections are Neptune Blvd @ Blossom St and Lynn Station.
Affected direction: Outbound Affected stops: Tremont St opp St Mary's High School Market St @ Tremont StPosted 9/16/2025 4:29:01 PM
Jackson Square: The stairway connecting the Jackson Sq lobby and the south end of the platform is closed until winter 2026. Use the stairway at the north end of the platform. This closure is for the construction of a new stairway and a second elevator.
Posted 9/12/2025 4:41:37 PM
Construction is ongoing in the Hingham Parking lot and on Shipyard Drive in preparation for the Hingham Ferry Dock upgrades. There is reduced parking in the lot, and portions of Shipyard Drive and driveways to and from the parking lot are affected
Posted 9/3/2025 12:40:18 PM
Route 220 buses no longer serve this stop due to the new route on Shipyard Drive. Please use Lincoln St @ Lincoln Plaza, about 600 feet away.
Affected routes: 220Posted 9/3/2025 9:48:01 AM
Route 429 detoured due to construction. The nearest outbound connections are Lynn Station and Market St @ Liberty St.
Affected direction: Outbound Affected stops: Oxford St @ Washington St Oxford St @ Market StPosted 9/2/2025 2:57:01 PM
Routes 71 and 73 are detoured due to construction. The nearest connections are Mt Auburn St @ Mt Auburn Hospital or Mt Auburn St @ Traill St.
Affected stops: Mt Auburn St @ Longfellow Rd (outbound) Mt Auburn St @ Sparks St (outbound) Mt Auburn St opp Sparks St (inbound)Posted 8/27/2025 4:35:01 PM
Ruggles Escalator 136 (Orange Line platform to upper lobby) unavailable
Posted 8/7/2025 1:46:01 PM
Elevator #779 from the pedestrian bridge to the platform is temporarily out of service at East Taunton until further notice. Please use the accessible ramp for access to the platform.
Posted 8/1/2025 11:03:00 AM
Assembly Escalator 442 (Foley Street to unpaid lobby) unavailable due to maintenance
Posted 7/1/2025 9:45:01 AM
Malden Center Escalator 312 (Street level to Commuter Rail platform) unavailable due to maintenance.
Posted 4/30/2025 11:12:16 AM
South Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance.
Posted 4/8/2025 12:11:16 PM
State Escalator 6 (Oak Grove platform to Old State House lobby) unavailable
Posted 4/7/2025 8:37:15 AM
The Riverside Ave entrance at Campello Station is currently closed. Passengers may continue to use the Plain St entrance.
Affected lines: Fall River/New Bedford LinePosted 3/24/2025 12:38:14 AM
There is no accessible path connecting the inbound and outbound platforms at Wellesley Square Station. The existing path includes steep slopes and is long. Designs are underway to provide for a fully compliant pathway.
There are accessible mini-high platforms at the Western end of both the Track 1 and Track 2 sides. However, the existing pedestrian path between the two sides is long and includes steep slopes, especially on the Crest Road bridge over the tracks. Designs are underway to provide for a fully compliant pathway.Posted 3/7/2025 2:07:16 PM
Littleton/Route 495 passengers can expect occasional traffic and detours accessing the station due to the Foster Street reconstruction work.
Scheduled to complete sometime in 2027, the Reconstruction of Foster Street includes widening and resurfacing with the addition of bicycle lanes.Posted 2/12/2025 2:49:16 PM
Andrew Escalator 123 (Ashmont/Braintree platform to busway) is unavailable until further notice pending replacement.
Posted 1/16/2025 10:30:43 AM
Hingham/Hull Ferry: Portions of the Town of Hull parking lot at the Hull ferry terminal are blocked off for sewer pump station construction work through 2025. More information is available at https://www.town.hull.ma.us/
Posted 7/4/2024 8:33:16 AM
The Upper Parking Lot at Worcester Station is closed with the exception to accessible parking, due to construction.
Posted 6/28/2024 10:57:46 AM
Oak Grove Escalator 105 (Commuter Rail platform to unpaid lobby) unavailable
Posted 6/20/2024 9:04:16 AM
Courthouse Escalator 417 (Airport/Design Center platform to south lobby) unavailable due to ongoing construction at the station.
Posted 8/16/2023 7:58:49 AM
Courthouse Escalator 415 (Airport/Design Center platform to lobby) unavailable due to ongoing construction at the station.
Posted 8/16/2023 7:58:16 AM
Bowdoin Escalator 125 (Lobby to street) is unavailable until further notice pending replacement.
The escalator will remain out of service for the foreseeable future. This decision was made after a thorough inspection determined that corrosion on the escalator’s steel truss was so severe that it could not be repaired further and that a complete replacement of the escalator would be required. Replacing the escalator at this location requires a more extended unit meeting modern escalator safety requirements. This longer unit will require significant alteration to the station entrance to meet code requirements. The MBTA has currently begun design work to understand what station upgrades will be needed. Due to these complexities, we expect the escalator will remain out of service for a significant time. We recognize the challenges this poses to our riders, and please know we are working to identify a solution as quickly as possible. In the meantime, Government Center Station, which is fully accessible and serves the Blue Line, is under a quarter-mile from Bowdoin Station.Posted 6/13/2023 10:12:06 AM
Lynn Parking Garage arcade stairs 1 and 2 are closed until further notice due to structural issues. Customers may exit the garage via elevators to the ground level or by using the south stairs located on the Market street side of the garage.
Vehicular access to the upper 2 levels of the garage is restricted. The garage has sufficient parking capacity to accommodate daily demand.Posted 10/20/2022 2:23:44 PM